The U.S. 98 Pensacola Bay Bridge replacement project began in 2017 to address hurricane evacuation traffic needs. The replacement required PDA Testing on test piles and production piles. Data was assessed via CAPWAP® data analyses to provide simulated static load testing. Hurricane Sally interrupted construction in 2019, and potential damages to production piles were assessed using Low Strain Integrity Testing.