The Corpus Christi export terminal was permitted for a regasification terminal. GRL Engineers performed Dynamic Pile Monitoring using a Pile Driving Analyzer (PDA), SiteLink Remote Testing, Crosshole Sonic Logging, Thermal Integrity Profiling and Pile Integrity Testing on test shafts for the terminal foundation.