PDA and GRLWEAP Save Thousands on the Hugh Leatherman Terminal Project

The article in Pile Driver states “Based on WEAP results and multiple conversations with the contractor, Insight Group was able to economize by having a single Vulcan 510 air hammer to be used for both initial driven and re-strike… PDA results verified the design inputs and provided additional confidence in the design change.”