Lake Marion Greenway Trail Boardwalk

GRL Engineers provided load testing to check the foundation capacity for the Marion greenway trail boardwalk. Initially Static Load Testing was provided and the project continued with Dynamic Load Testing utilizing the APPLE VII. The switch to dynamic testing allowed for significant time savings.