PDI Subscribe to Newsletter

Newsletter Sign Up

  • This field is for validation purposes and should be left unchanged.
Pile
info@grlengineers.com
SAMPLE TESTING SPECIFICATIONS
REFERENCE LIBRARY
  • Home
  • About Us
    • Leadership
    • Our Engineers
  • Services
    • All GRL Services
    • PDA Services
      • APPLE Load Testing Systems
      • Dynamic Load Testing Services
      • Dynamic Pile Monitoring Services
      • Dynamic Load Testing of Helical & Micro Piles
    • GRLWEAP Wave Equation Analysis
    • CAPWAP Analysis
    • Integrity Testing
      • Thermal Integrity Profiling (TIP)
      • Crosshole Sonic Logging (CSL)
      • Gamma Gamma Logging (GGL)
      • Low Strain Integrity Testing (PIT)
    • Bi-Directional Static Load Testing
    • Static Load Testing
    • Drilled Shaft Profile & Verticality Evaluation
    • Drilled Shaft Base Cleanliness Evaluation
    • Energy Measurement
      • SPT Energy Calibration
      • Becker Drill Instrumentation
    • Offshore Foundation Testing
    • Specialty Engineering Services
      • Data Review & Analysis
      • Evaluation of Existing Foundations
      • Evaluation of Unknown Foundation Lengths
  • News & Events
    • News
    • Events
    • Newsletters
  • Resources
    • Statement of Qualifications
    • Brochures
    • Case Studies
    • Technical Specifications
    • Reference Papers
    • Videos
  • Contact Us
    • Central Office
    • California
    • Colorado
    • Florida
    • Georgia
    • Illinois
    • Louisiana
    • North Carolina
    • Ohio
    • Pennsylvania
    • Texas
    • Washington
  • Careers
  • Home
  • About Us
    • Leadership
    • Our Engineers
  • Services
    • All GRL Services
    • PDA Services
    • GRLWEAP Wave Equation Analysis
    • CAPWAP Analysis
    • Integrity Testing
    • Bi-Directional Static Load Testing
    • Static Load Testing
    • Drilled Shaft Profile & Verticality Evaluation
    • Drilled Shaft Base Cleanliness Evaluation
    • Energy Measurement
    • Offshore Foundation Testing
    • Specialty Engineering Services
  • News & Events
    • News
    • Events
    • Newsletters
  • Resources
    • Statement of Qualifications
    • Brochures
    • Case Studies
    • Technical Specifications
    • Reference Papers
    • Videos
  • Contact Us
    • Central Office
    • California
    • Colorado
    • Florida
    • Georgia
    • Illinois
    • Louisiana
    • North Carolina
    • Ohio
    • Pennsylvania
    • Texas
    • Washington
  • Careers

Case Studies

GRL Engineers offer a wide range of deep foundation testing and consulting services, nationwide. Most GRL Engineers have achieved Advanced Level or higher on both the PDCA/PDI Dynamic Measurement and Analysis Proficiency Test.


Resources

  • Brochures
  • Case Studies
  • Technical Specifications
  • Reference Papers
  • Videos

Case Studies

Concrete Integrity Testing on the Tri-State Tollway Mile Long Bridge

In 2019, the new foundations for the NB bridge began - a project that would replace the Mile-Long Bridge located on I-294 in Willow Springs, Illinois. GRL Engineers were brought onto the job in 2020 to apply various testing methods to assess the concrete integrity of the new foundation supports. Read More

Dynamic Measurements of Vibratory Driven Composite Steel Piles Subjected to Axial and Bending Forces

An investigative project by GRL Engineers was analyzing acceleration and stresses in non-uniform piles during vibratory driving. Read More

Dynamic Pile Monitoring of Cast-In-Drilled-Hole (CIDH) Test Piles

The Case Pacific Company in California contacted GRL Engineers to help collect high-strain dynamic measurements on two Cast-In-Drilled-Hole piles. The project in Oakland at the 1100 Broadway Avenue, was initiated to update... Read More

Load Testing Performed on Milwaukee High-Rise at 777 Van Buren

The project consists of a 33-story building in Milwaukee, Wisconsin, USA, with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engineer, testing agency, structural engineer, construction manager, and pile-driving contractor resulted in an efficient... Read More

GRL Performs Various Q/A Tests on the Harbor River Bridge

Proposed in 2014, the Harbor Bridge replacement project has begun construction with quality assurance testing. The known vacation destination, Harbor Island, is accessed through this drawbridge, located on US-21 in South Carolina. This sea island was originally hunting land that had little need for incoming and outgoing traffic, which was sufficient for the bridge’s original capacity. Read More

New Jersey Hurricane and Storm Damage Reduction Project

Hurricane Sandy hit the coastline of New Jersey at the end of October 2012, causing millions of dollars in damages including 750 homes impacted by the storm in Port Monmouth township, New Jersey. Read More

Bridge Replacement in Growing Cairo, West Virginia

The small town in Cairo, West Virginia began growing in truck traffic when the oil and gas industry started taking roots in the city. Off of a major highway, the original bridge connected route 31 over the North Fork Hughes River. Burgess and Niple reached out to GRL Engineers to bring them on the project for testing. Read More

SR-19 Over Little Lake Harris Bridge

The current bridge over Little Lake Harris in Central Florida has been in use since 1950. The original bridge that connected Howey and Astatula was a long, wooden bridge that opened in 1927. After the second span was built, the wooden bridge was torn down, only leaving a small dock in its place. Being the third iteration of the pathway from Howey and Astatula, it is of significance that the new bridge can service the drivers of Lake County, Florida. Read More

Russell Street Bridge Replacement

The existing 2-lane Russell Street Bridge in Missoula, Montana, a major highway with high traffic volume, was in need of reconstruction. GRL was contacted to perform a bi-directional static load test (“BDSLT”) on a representative test shaft. The test shaft had a diameter of 71 inches, and a length of 75 feet. The embedded bi-directional jack assembly contained three 2,200-kip GRL-Cells, resulting in a potential test load of 13,200 kips. GRL provided thermal integrity profiling (“TIP”) services to assess concrete quality and post-concreted geometry of the test shaft. Read More

Norfolk Southern Rail Road Over the Grand River

The Norfolk Southern Railroad Bridge over the Grand River in Painesville, OH, was built in 1905 and reinforced in the 1940’s. High maintenance costs and a restrictively large footprint in the Grand River led to the decision to replace the bridge.  The Great Lakes Construction Company was awarded the contract and chose Suburban Maintenance Construction, Inc. to install 26 drilled shaft foundations ranging from 4’ to 7’ diameter and up to 93.5 feet in length.  GRL Engineers, Inc. provided the SQUID equipment, data evaluation and reporting. Read More

The New Tappan Zee Bridge

GRL’s services for Tappan Zee Constructors included completing a multitude of Wave Equation Analyses for hammer selection, Dynamic Pile Testing (PDA) on temporary and permanent 36 to 48-inch diameter open end pipe piles, performing Crosshole Sonic Logging (CSL) and Thermal Integrity Profiling (TIP) on 48 to 96-inch diameter drilled shafts. GRL also provided expert services on data interpretation and reviewing project specifications. Additionally, GRL Engineers provided driving criteria based on the Wave Equation Analyses, dynamic testing results and field observations. Read More

Corpus Christi Liquefaction LNG

Corpus Christi Liquefaction, LLC, a subsidiary of Cheniere Energy, is developing and constructing a liquefied natural gas (LNG) export terminal at one of Cheniere's existing sites that was previously permitted for a regasification terminal.   PDA Testing, SiteLink® Remote Testing, Crosshole Sonic Logging, Thermal Integrity Profiling and Pile Integrity Testing on Drilled Shafts was per formed. Read More

Volusia County Veterans Memorial Bridge

The Tom Staed Veterans Memorial Bridge, also known as Orange Avenue/Silver Beach Avenue Bridge, closed June 6, 2016 for a 32-month construction project. GRL is providing dynamic pile testing and related specialty services to Volusia County thru the CDM Smith CEI contract. Specialty Consulting Services and Dynamic Pile Testing Services were performed. Read More

Port of Tacoma Pier 4

The Port of Tacoma has numerous Piers for the loading and unloading of ships carrying containers. GRL Engineers also performed dynamic pile monitoring on selected piles, during initial driving, and again during restrikes. Preliminary GRLWEAP Analysis, Dynamic Pile Monitoring and CAPWAP Analysis were performed. Read More

Bonner Bridge

Since the Bonner Bridge was constructed in 1965, numerous hurricanes have struck the Atlantic coast wreaking havoc on the Outer Banks of North Carolina.  GRL Engineers were called in to help aid in the replacement of this nearly three-mile long bridge across the Oregon Inlet from Bodie Island to Hatteras Island. Static Load Testing and PDA Testing Services were performed. Read More

Kentucky Lake Bridge

Eggner’s Ferry Bridge, also known as Kentucky Lake Bridge, was the first of two major structures in the Lake Bridges Projects. The bridge carries US-68 over Kentucky Lake, connecting the land between the lake’s National Recreational Area. Preliminary GRLWEAP Analysis, Dynamic Pile Monitoring (underwater) and CAPWAP Analysis were performed. Read More

SR 36 over Tuscarawas River

GRL was contracted by Complete General Construction Company to consult on hammer selection, pile wall thickness, and static load testing for the SR 36 bridge over the Tuscarawas River in Gnadenhutten, OH. In addition, GRL’s scope of work included dynamic pile testing and performance of the static load test. Preliminary GRLWEAP Analysis, Dynamic Pile Monitoring, CAPWAP Analyis and Static Load Testing Services were performed. Read More

I-90 Innerbelt Bridge

The George V. Voinovich Bridge, also known as Cleveland’s Innerbelt Bridge, carries I-90 over the Cuyahoga River Valley near downtown Cleveland, Ohio. The construction was completed in two design-build phases and was the first design-build project for the Ohio Department of Transportation. Preliminary GRLWEAP Analysis, Dynamic Pile Monitoring, APPLE Load Testing, Crosshole Sonic Logging and Thermal Integrity Profiling Services were performed. Read More

About Us

  • About GRL
  • Leadership
  • Our Engineers
  • Careers

News & Events

  • Events
  • News
  • Newsletters

Resources

  • Brochures
  • Case Studies
  • Technical Specifications
  • Reference Papers
  • Videos
  • Contact

    • Contact Us
    30725 Aurora Rd
    Cleveland, OH 44139 USA
    (216) 831-6131
    info@grlengineers.com

    • STATEMENT OF QUALIFICATIONS
    • PRIVACY POLICY
    • TERMS & CONDITIONS
Copyright © GRL Enginners, Inc. All rights reserved.