GRL Engineers offer a wide range of deep foundation testing and consulting services, nationwide. Most GRL Engineers have achieved Advanced Level or higher on both the PDCA/PDI Dynamic Measurement and Analysis Proficiency Test.

Filter by:
Deep Foundation Testing Services Available to Address All Project Specifications
Deep foundation testing methods are utilized to provide information regarding a structure’s integrity, load capacity, concrete quality, conformance to the foundation design and potential optimization of the deep foundations. GRL Engineers, Inc. has provided a variety of deep foundation testing services and analyses for 50 years. Many projects require multiple…
Read More >
Southwest Florida International Airport Expansion
Challenge: The Southwest Florida International Airport in Fort Myers Florida underwent a $1.1 Billion expansion in the second phase of the airport’s reconstruction project. The airport expansion was an effort to accommodate an expected growth in passenger traffic, and was led by the Lee County Port Authority. The first phase…
Read More >
Multi-Year Testing on Highway I-69
Challenge: The construction of I-69, a major US interstate highway that starts at the bottom of Texas and travels northeast to Michigan and into Ontario, was a multi-decade endeavor and a massive undertaking for the FHWA. GRL Engineers provided a multitude of testing services throughout the state of Indiana. Some…
Read More >
Plaquemines LNG Megaproject in Port Sulphur
Challenge: Venture Global, Inc. set off the construction of the Plaquemines LNG terminal, making the plant one of the largest LNG facilities globally with an export capacity estimated to be 20 million tonnes per annum (MTPA). The massive project would require the installation and testing of thousands of piles to…
Read More >
Dynamic Load Testing on Helical Piles
Challenge: The YWCA of Toledo wanted to add 11,000+ sf of usable space by installing a foundation through the existing basement swimming pool to support two new floors being constructed above it. Due to low clearance restrictions within the building structure, micropiles were used in the initial foundation design. The…
Read More >
Corvallis Van Buren Bridge Replacement
Challenge: The Corvallis Van Buren Bridge, originally constructed in 1913, underwent a replacement initiative to create an earthquake-ready bridge over the Willamette River on eastbound OR-34. Although the area near the bridge was used as a community dump site in the early 20th century, today this stretch of the Willamette…
Read More >
St. Francis Hospital Parking Garage Replacement
Challenge: The Saint Francis Hospital in Hartford, Connecticut is one of the largest hospital facilities in New England, housing a Level 1 trauma center with 617 beds and is a major teaching hospital. The original facility was constructed in 1885, and a four-level parking garage was constructed in 1983. The…
Read More >
Ashbridges Bay Wastewater Treatment Plant
Challenge: The Ashbridges Bay plant is one of Toronto’s four wastewater treatment plants which services the metropolitan area. According to an annual report, it was determined that the plant was ready for several upgrades. The proposed foundation consisted of large diameter pipe piles with conical tips. GRL Engineers provided static…
Read More >
Tampa Bay Desalination Facility
Challenge: The Tampa Bay Desalination Plant, originally designed in 2007, has been providing millions of gallons of drinking water for Florida residents. To accommodate a growing need for drinking water, the plant has undergone an expansion with system upgrades. The new facility utilized augered cast-in-place (ACIP) piles for the foundation…
Read More >
Extensive Load Test Drilled Shaft Program with Integrity Assessments
Challenge: A project in Ohio for a large plant was initiated in 2023. A substantial test program was established. The goal of the program was to confirm the shaft design in compression, tension, and lateral capacity, as well as establish proper shaft installation techniques for production shafts. Integrity testing was…
Read More >
Sand Island Wastewater Treatment Plant
Challenge: The city of Honolulu embarked on an expansion of the Sand Island wastewater treatment plant to account for residential growth. The $180.5 million expansion included construction of a second digester at the facility, as well as raising the facility to account for rising sea levels. Hawaiian Dredging Construction Company…
Read More >
Ports of Indiana - Burns Harbor
Challenge: The $77-million expansion projects underway at Ports of Indiana-Burns Harbor in 2024 included the construction of a highway bridge leading into the port, three new ship berths, a new bulk warehouse, two new railyards, industrial site development, and comprehensive dock and rail rehabilitation. GRL Engineers provided pile dynamic load…
Read More >
Florida High Speed Rail
Challenge: The All Aboard Florida Passenger Rail was a private high-speed rail project that connected hundreds of miles along one of the most visited states in the US. The rail connects Orlando in Central Florida to Miami in South Florida, covering 235 miles. The trains operate at a speed of…
Read More >
Trinity River Railroad Bridge
Challenge: The Trinity Bridge in Liberty, Texas underwent reconstruction in 2021 to replace the aging components of the 523-foot-long railroad bridge. Originally built in 1904, the bridge connects two of the nation’s busiest ports in the cities of Beaumont and Houston. During construction, one of the drilled shafts experienced issues…
Read More >
West Virigina Shaft Bottom Cleanliness Specifications
Because of the relatively shallow bedrock geology, the use of drilled shafts has become a standard practice for the West Virginia Department of Highways (WVDOH) in West Virginia, the “Mountain State”. According to the Drilled Shaft Guidelines provided by the WVDOH, having an assessment of bottom cleanliness is required for…
Read More >
Central 70 Highway Project
Challenge: The Central 70 Project is a $1.2 billion endeavor to improve the widely used highway in Colorado. The project was started in 2018 to update the aged highway with 10 miles of reconstructed roads, add a new express lane in each direction, update the viaduct, lower the interstate, and…
Read More >
Offshore Wind Farms in New Jersey
Challenge: GRL Engineers were brought onto a research project related to offshore wind to provide deep-foundation expertise. The New Jersey coastline has been expanding its offshore wind efforts since the signing of Executive Order 28 from New Jersey Governor Murphy in 2020. Addressing the potential in South Jersey for wind…
Read More >
Scotts Hill Water Tower in Wilmington, NC
Challenge: The small community of Scotts Hill in Wilmington, North Carolina started seeing rapid development of new housing and road improvements in 2023. With neighboring cities nearly doubling in the last decade, Scotts Hill is beginning to see similar growth and is continuing development to accommodate it. Due to the…
Read More >
NASA Vehicle Assembly Building
Challenge: In preparation for NASA’s Artemis missions returning to the Moon; the largest single-story building in the world, the Vehicle Assembly Building (VAB) at Kennedy Space Center, Florida, underwent structural upgrades and modifications to accommodate the Space Launch System (SLS) and Orion spacecraft. GRL Engineers, Inc. assisted Kingstruction-Advon Joint Venture…
Read More >
Radius Dilworth Overlook in Charlotte
Challenge: The Radius Dilworth Overlook is an apartment complex in Dilworth, a Charlotte neighborhood, that broke ground in May 2022. With construction to be completed by late 2024, the complex will house 352 apartment units and contain 26 floors. The complex will be the tallest building in Dilworth to date.…
Read More >