Replacement Bridge Over Buffington Road and NFS Railroad
The SCDOT retained GRL Engineers to perform testing on a production shaft. Drilled shaft verticality and cleanliness were evaluated on the production shaft. Bi-Directional Static Load Testing was performed on the drilled shaft to determine the mobilized shaft resistance. Thermal Integrity Profiling to assess concrete integrity and shaft profile.