Multi-Year Testing on Highway I-69

The Illinois office of GRL Engineers provided various testing services for major highway, I-69. Dynamic Load Testing with CAPWAP Analyses was utilized to monitor pile driving during installation. Static Load Testing was implemented on test piles to assess pile capacities, and integrity methods such as Crosshole Sonic Logging, Thermal Integrity Profiling, and Low Strain Integrity Testing were utilized to assess drilled shaft foundations.