
Case
Studies
GRL Engineers offer a wide range of deep foundation testing and consulting services, nationwide. Most GRL Engineers have achieved Advanced Level or higher on both the PDCA/PDI Dynamic Measurement and Analysis Proficiency Test.

Featured
Sand Island Wastewater Treatment Plant

Featured
St. Francis Hospital Parking Garage Replacement

Featured
West Virigina Shaft Bottom Cleanliness Specifications


Bridge Abutment and Boardwalk at TI' awh ah dees Park

Central Florida Expressway SR 528 and SR 436 Interchange Reconfiguration

El Dorado National Forest Bike Trail

Rehabilitating the Van Wyck Expressway

Commuter Rail Station Expansion

SR23 First Coast Expressway

Lynch River Bridge Replacement

Northwest Railroad Bridge Project

Replacement Bridge Over Buffington Road and NFS Railroad

I-480 Valley View Bridge Pile Test Program

Lake Marion Greenway Trail Boardwalk

I-4 Ultimate

Harris County Toll Road Authority SH 249

Seattle Center Arena

Mukilteo Multimodal Ferry Terminal

Tri-State Tollway Mile-Long Bridge
In 2020, GRL Engineers were contracted to perform testing on the Mile-Long Bridge located in Willow Springs, Illinois. Various testing methods were performed to assess the concrete integrity including Crosshole Sonic Logging, Thermal Integrity Profiling, and Data Analyses.

North Madison Substation
GRL Engineers took on an investigative project on the North Madison Substation in Wisconsin, to analyze acceleration and stresses in non-uniform piles during vibratory driving. The test involved Dynamic Pile Monitoring using a Pile Driving Analyzer (PDA) and the PDI-VIB Program.

1100 Broadway Avenue in Oakland
GRL Engineers were contracted to perform Dynamic Pile Monitoring with a Pile Driving Analyzer (PDA) and collect high-strain dynamic measurements using APPLE Load Testing. A CAPWAP Analysis was performed using the collected test data.
