Case

Studies

GRL Engineers offer a wide range of deep foundation testing and consulting services, nationwide. Most GRL Engineers have achieved Advanced Level or higher on both the PDCA/PDI Dynamic Measurement and Analysis Proficiency Test.

Filter by:
Washington Port of Tacoma
The Port of Tacoma in Washington state has numerous Piers for the loading and unloading of ships carrying containers. The original configuration of Pier 4 is at an angle with Pier 3. Reconfiguring Pier 4 to be aligned with Pier 3 will create a straight, continuous wharf of almost 3,000…
Read More >
Bonner Bridge
Since the Bonner Bridge was constructed in 1965, numerous hurricanes have struck the Atlantic coast wreaking havoc on the Outer Banks of North Carolina. As a result, GRL Engineers were called in to help aid in the replacement of this nearly three-mile long bridge across the Oregon Inlet from Bodie…
Read More >
Kentucky Lake Bridge
Eggner’s Ferry Bridge, also known as Kentucky Lake Bridge, was the first of two major structures in the Lake Bridges Projects. The bridge carries US-68 over Kentucky Lake, connecting the land between the lake’s National Recreational Area and includes a basket handle tied arch over the main navigational channel. Johnson…
Read More >
SR 36 Bridge over Tuscarawas River
Large diameter open end pipe piles with interior constrictor plates were chosen as the foundations for the SR 36 bridge over the Tuscarawas River in Gnadenhutten, OH. In addition, a nearly 2,400 kip static load test was specified to evaluate the design methods used for this pile type. GRL was…
Read More >
I-90 Innerbelt Bridge
The George V. Voinovich Bridge, also known as Cleveland’s Innerbelt Bridge, carries I-90 over the Cuyahoga River Valley near downtown Cleveland, Ohio. The construction was completed in two design-build phases and was the first design-build project for the Ohio Department of Transportation. The six year, $566 million, twin bridge project…
Read More >